Automation and high density
Home/Warehouse racking/Automation and high density
Automation and high density

High-density and automated storage: choosing a strategy

Density and automation address different problems. Define space constraints, throughput and acceptable access time before comparing handling automation and aisle arrangements.

Compare storage systems →Prepare the inputs

How to organise load storage

Compare capacity, handling cycle, inventory integration and maintenance access. Higher density alone does not guarantee faster warehouse operations.

Start with flow, not equipment

Specify peak receipts and dispatches, item count, batch sizes and acceptable waiting time. Separate the need for more storage from faster handling. Automating movement does not by itself remove bottlenecks in receiving or picking.

Define control and integration scope

Define which system controls addresses, tasks and operation confirmation: inventory software, WMS or equipment controls. Separate racking, machinery, software and integration responsibilities. A shuttle alone does not make the entire warehouse automated.

System availability and service

Compare service access, spare parts, power and downtime procedures. Denser rows change load accessibility and staff routes. Agree recovery scenarios and implementation phases before committing to the final layout.

Match the system to the task

Preliminary comparison: check the final layout against warehouse inputs.
Storage taskSolutionWhat to check
Pallet movement inside lanesPallet Shuttle racking →Coordinate lane loading, shuttle operation and external handling.
Fewer permanent aislesMobile racking systems →Check aisle opening time and concurrent access.
Automated storage and retrievalAS/RS automated warehouses →Define carriers, throughput and control interfaces.
01 / Structural comparison

Compare construction options

Compare capacity, handling cycle, inventory integration and maintenance access. Higher density alone does not guarantee faster warehouse operations.

25Engineering calculation
Rack-clad warehouses

Rack-clad warehouses

A high-bay system in which the racking structure also supports the building envelope and environmental actions.

Goods
Pallets or automated carriers
Access
Stacker cranes / shuttles
Goods flow
Automated
Open solution →QuestionnaireOpen in shop
26Engineering calculation
AS/RS automated warehouses

AS/RS automated warehouses

Racking, cranes or shuttles, conveyors and controls combined as one automated storage system.

Goods
Pallets, cartons, trays and special carriers
Access
Automatic
Goods flow
WMS/WCS task-driven
Open solution →QuestionnaireOpen in shop
14Engineering calculation
Mobile racking systems

Mobile racking systems

Pallet, shelving or archive rows on mobile bases with an active aisle.

Goods
Pallets, cartons and archives
Access
Through the active aisle
Goods flow
By access regime
Open solution →QuestionnaireOpen in shop
05Engineering calculation
Pallet Shuttle racking

Pallet Shuttle racking

A radio shuttle moves pallets inside a deep lane without forklift entry.

Goods
Pallets
Access
By lane
Goods flow
FIFO or LIFO
Open solution →QuestionnaireOpen in shop
02 / Initial data

Information needed for the calculation

01Peak inbound and outbound throughput
02WMS integration and addressing rules
03Maintenance access and downtime scenario
Where to start

Does the entire warehouse need automation at once?

Not necessarily. Compare automation of one process zone with phased deployment. Define phase boundaries, task exchange and operation during downtime before selection.

Project preparation guide (in Russian) →

Industries and operating conditions

Match your chosen layout to the cargo, environment, equipment and handling process in your industry.

Manufacturing warehousesWIP and inter-operation buffersFinished goods and packagingDistribution centres3PL and contract warehousingFulfilment and e-commerceFood warehousesCold and freezer warehouses

Other storage needs

Pallet storageCartons and piece goodsLong goods and metalSpecialized loadsMezzanines
Skip to main content
Racking and steel structures manufacturer
manager@максстор.рф
Maxstore racking
Racking ⌄
Storage systemsChoose by load and access method
All types →
Pallet storage →Selective pallet rackingVery narrow aisle VNADouble-DeepDrive-inFlow rackingPush-BackPallet ShuttleMobile pallet racking
Cartons and piece goods →ShelvingCash & CarryLongspanCarton FlowArchive shelvingMobile shelving
Long goods and metal →CantileverMetal stock racking
Automation and high density →Rack-CladAS/RSMobile rackingPallet Shuttle
Specialized loads →Tyre and wheel rackingRoll rackingReel rackingSpecial systems
Mezzanines →Column-supportedPallet-rack supportedShelving-supportedCombined
Create a rackCreate a warehouse planShopInstallation and serviceManufacturingContacts
Account ↗
  • All racking
  • Pallets and big bags
  • Boxes and individual goods
  • Mezzanines
  • Special loads
  • Long goods and metal

Maxstore rack manufacturing

Rack manufacturing starts with load dimensions, weight per level and the building layout. Profiles, connections and finishes are selected against the agreed specification. Geometry, markings and the completeness of the assembly kit are checked before dispatch.

The photographs show Maxstore production facilities. The project specifies the components and permissible loads for your warehouse.
Maxstore production line

Maxstore production line

Maxstore production photo
Maxstore production area — factory archive photograph 2Maxstore production area — factory archive photograph 3Maxstore production area — factory archive photograph 4

Continue your selection

Rack-clad warehouses →AS/RS automated warehouses →Mobile racking systems →Pallet Shuttle racking →Warehouse racking questionnaires →
Maxstore racking
ProjectRacking typesStructural componentsIndustriesCreate a rackCreate a warehouse plan
Shop and serviceCatalogueInstallation and dismantlingDocumentsPrice listProject designsManufacturingOrders and requests
Contact usmanager@максстор.рфContactsLegal documents
PKP MAXSTORE LLC · TIN 5036116030 · KPP 503601001 · OGRN 1115074011568Office 3, 16 Lobacheva Street, Podolsk, Moscow Region, 142116, Russia
Maxstore · storage systemsLoad-bearing components and detailed design require engineer approval.