Завод стеллажей и металлоконструкций

Warehouse racking by Maxstore

We design and manufacture warehouse storage systems. Start with your load, handling equipment and building layout, then agree the configuration, specification, supply and installation requirements.

Warehouse racking by Maxstore
01 / Factory

Designing since 1991, manufacturing since 1998

Maxstore began with the supply and design of warehouse equipment. Since 1998, the company has developed its own steel rack manufacturing, from profiling and punching to welding, coating and order assembly.

03 / Product series

Choose a series to suit the task

A series name identifies a product family. Permitted loads apply to a specific combination of uprights, beams, shelves and connections.

Steel / Standard

Painted steel. Section geometry and thickness depend on loads and structural design.

СуперЦинк

Galvanized heavy-duty systems. Connections and components are checked for the particular series.

УниЦинк

Shelving and multi-level solutions. We select storage bays, decking and practical manual picking heights.

НовыйЦинк

Configuration is confirmed against the current range. Extensions require the existing system's markings and specifications.

Compare sections and components →
04 / Benefits

A storage system that can grow

01

Designed for assembly

Connections and the assembly sequence follow the selected system's documentation.

02

Modular expansion

Additional bays can be planned in advance and installed as stock grows.

03

Access to stored goods

Storage is selected to suit the range, turnover and handling equipment.

04

Location-based storage

Rows, bays and levels create a clear structure for locating stock.

05

Compatible components

Decking, guards and barriers are matched to the structure and its purpose.

06

Maintenance and repairs

Marking and order history help identify replacements for damaged parts.

05 / Order stages

From the first brief to acceptance and service

Each stage has clear inputs and outputs. Production, delivery and installation dates are agreed for your order.

Consultation

Define the goods, receiving and picking methods. Select suitable rack types and the information needed to proceed.

Prepare your project

Use simple selection for a first configuration, or advanced mode when you know the parameters. Your inputs remain available when you switch modes.

The online calculation estimates geometry, nominal capacity and component quantities. It does not certify load-bearing capacity or replace a working design.

08 / Operating conditions

Five checks for materials and coating

Operating conditions form part of the brief before selecting sections. Temperature, chemical and electrical requirements must be confirmed for the actual configuration and design.

  1. Wear and impacts
  2. Moisture and corrosion
  3. Operating temperature
  4. Contact with chemicals
  5. Lighting and electrical equipment

Need a custom component?

Prepare a sketch or drawing, dimensions, material, coating and quantity. These define processing, delivery contents and manufacturing cost.

Discuss manufacturing →
09 / Completed projects

Storage solutions in real warehouses

Photographs from the Maxstore archive show different goods, access methods and layouts. Every new project requires its own layout and load calculations.

10 / Experience and documents

Samples, documents and configuration checks

Exhibitions and documents illustrate the development of the equipment. Current drawings, a product passport and acceptance documents are agreed for your order.

Maxstore exhibition stand — archive photograph
Maxstore exhibition samples
Archive certificate image
Certificate · archive
Archive patent image
Patent · archive

Archive images do not confirm current document validity. Request the documents relevant to the selected products and your order.

Request documents →

Manufacturing and services

Review the manufacturing materials and the scope of design, supply, installation and service. Prices, availability and delivery conditions are confirmed for the selected configuration.