Завод стеллажей и металлоконструкций
Cartons and piece goods
Cartons and piece goods

Box and piece storage: organising order picking

Manual picking depends on bin dimensions, access frequency and replenishment. Compare cartons, individual parts and archive units: equal mass does not imply the same shelving layout.

01 / Comparison to

Compare construction options

Separate reserve stock from picking stock. For frequent orders, assess walking distance and replenishment without interrupting picking; for infrequent access, focus on floor utilisation.

06Configurator
Shelving

Shelving

Manual picking of cartons and piece goods with adjustable level heights and shelf types.

Goods
Cartons and piece goods
Access
Every shelf
Goods flow
Picking / reserve
07Engineering calculation
Cash & Carry racking

Cash & Carry racking

A retail-and-storage row: lower levels for manual picking and display, with pallet reserve above.

Goods
Pallets, cartons and individual items
Access
Customer or picker below, handling equipment above
Goods flow
Replenishment + sales / picking
24Engineering calculation
Mobile shelving

Mobile shelving

Shelving or archive rows on manual, mechanical or powered bases sharing an active aisle.

Goods
Cartons, documents and piece goods
Access
Through the active aisle
Goods flow
Location-based storage
02 / Input data

That required for calculation

01Carton dimensions and usable shelf depth
02Pick frequency and replenishment method
03Unit mass and load per level
Where to start

When is a separate picking zone useful?

When replenishment arrives in large batches but orders contain small quantities. Separate zones align containers, addressing and routes; size them using actual throughput.

Maxstore rack manufacturing

Rack manufacturing starts with load dimensions, weight per level and the building layout. Profiles, connections and finishes are selected against the agreed specification. Geometry, markings and the completeness of the assembly kit are checked before dispatch.

The photographs show Maxstore production facilities. The project specifies the components and permissible loads for your warehouse.

Maxstore production line

Production photo · videos in the Maxstore community